Project scale: 8 excavators, 2 bulldozers, 1 loader, 20 transport vehicles, and 30 on-site construction management personnel.
Project background: Xiaoqing River navigation restoration project, limited operating conditions, demolition and other construction difficulties are relatively large, and effective construction planning plans are formulated to dredge and transport earthwork and silt, and level the designated abandoned soil to meet the standards.
Cooperation mode: ജGeneral contractor, 2 kilometers in both di♎rections)
Project scale: 28 short-arm excavators, 32 24-meter long-arm excavators, and 30 on-site construction management personnel.
Project background: Xiaoqing River dredging project, with a long battle line, limited operating conditions, scattered operating points, demolition and other construction difficulties, and earthwork silt dredging and transportation.
Coo🐭pera🍃tion mode: Project leasing, 25 kilometers in both directions.
Project scale: 30 equipments, 65 management, maintenance and operation personnel.
Project background: Double-shift construction, long project cycle, harsh working conditions, high work intensity, Guangxi region has a long rainy season and is greatly affected by the weather.
Cooperation mode: A leasing mode combining monthly equipment rental and working hours, while providing equipment maintenance and on-site management servicജe peไrsonnel.
Project scale: 45 excavators, 95 management, maintenance and operation personnel.
Project background: long cycle, high work intensity, greatly affected by weather, and cumbersome management of 20 equipment purchased by the customer.
Cooperation mode: a leasing mode combining monthly equipment rental and working hours, while providing spare machines and on-sit😼e management service personnel.
Project scale: 16 excavators, 2 loaders, 24 articulated trucks, 42 management, maintenance and construction personnel.
Project background: The working environment is bad, the equipment wears out quickly, the customer has many operators, and the management is cumbersome.
Cooperation mode: Output contracting, settlement by ton, self-equipment and update of equipment according to produc🐽tion needs